When the Modi government came to power in 2014, the total length of national highways in the country was 91,287 km. Now in 2024, it has become 1.46 lakh km showing a massive 60% increase in a decade.
The Gurudwara was one of four bottlenecks in the road project, most parts of which were completed in 2013. Besides the gurudwara, the three other bottlenecks were a power line, a petrol pump, and water supply lines.